Objectives:
The purpose of this program is to encourage landowners and counties in the District to construct structures which provide grade stabilization and/or flood control.
General Policy:
It shall be the policy of the Lower Big Blue Natural Resources District to financially participate in the construction or rebuilding of dams located on private property. District cost-share shall be a percent of the cost of such projects. Cost of the project shall mean construction costs, including seeding and fencing where needed, engineering costs, inspection costs (during construction) and any land rights costs, should they be required, minus any federal and/or state funds available.
The cost-share schedule shall be:
| Drainage Area (Acres) | Cost-share (%) |
| 40-319 | 65 |
| 320-639 | 75 |
| 640-1279 | 82.5 |
| 1280 >>>> | 90 |
The board may consider 100% cost-share on a case-by-case basis.
The district policy outlined heretofore shall be the general policy of the district, however, when unusual circumstances dictate, the district may modify their financial contribution to these flood control or grade stabilization dams.
Application Eligibility and Procedure